Yonge and Davisville Yard Study  – Next Stop Davisville

The Next Stop: Davisville Feasibility Study is examining the potential redevelopment of the large area including 1900 Yonge Street (the TTC office building at the south west corner of Yonge and Chaplin) and decking the Davisville TTC Yard both south of Chaplin and a block to the north. As our area abuts the TTC  yard,Continue reading “Yonge and Davisville Yard Study  – Next Stop Davisville”

Have Your Say – Eglinton Avenue

While outside the boundaries of the DPRG, Eglinton Avenue is an important street in midtown Toronto and we wanted to make sure you are aware the City is consulting on its future design: In 2014 City Council approved the Eglinton Connects Planning Study which articulated the long term vision for Eglinton Avenue following the introductionContinue reading “Have Your Say – Eglinton Avenue”